02 950805.1        idc@idroconsulting.it      

  • Home
  • Idroconsulting
    • About us
    • Certificates
    • Ethical code and corporate policy
  • Products
    • Water Treatment Plants
      • Raw Water Pre-Treatment
      • Desalination / Demineralisation
      • Condensate Treatment
      • Potabilization
    • Wastewater Treatment
      • Sewage Wastewater Treatment
      • Deoiling Produced Water Treatment
      • Chemical Waste Treatment and Neutralisation
    • Sludge Dewatering
    • Chemical Injection Systems
    • Dryers and purification plants
  • Services
  • Main Projects
  • References
    • Reference List
    • Clients Our Contractors
    • Clients End Users: Power
    • Clients End Users: Oil & Gas
  • News
  • Contact US
    • Cookie and Privacy policy
  • English
  • Italiano
  • Home
  • Idroconsulting
    • About us
    • Certificates
    • Ethical code and corporate policy
  • Products
    • Water Treatment Plants
      • Raw Water Pre-Treatment
      • Desalination / Demineralisation
      • Condensate Treatment
      • Potabilization
    • Wastewater Treatment
      • Sewage Wastewater Treatment
      • Deoiling Produced Water Treatment
      • Chemical Waste Treatment and Neutralisation
    • Sludge Dewatering
    • Chemical Injection Systems
    • Dryers and purification plants
  • Services
  • Main Projects
  • References
    • Reference List
    • Clients Our Contractors
    • Clients End Users: Power
    • Clients End Users: Oil & Gas
  • News
  • Contact US
    • Cookie and Privacy policy
  • English
  • Italiano
Waste water treatment plant – Petrojet

Waste water treatment plant – Petrojet

  • On 25 November 2021

Idroconsulting is pleased to announce that the WWTP project in Egypt has come to an end.

The Scope of the Waste Water Treatment Plant is to treat an oily stream of water to reduce the TSS content, remove the phenols and adjust the pH in order to discharge them safely.

To achieve this there are three main steps:

  • The raw water is sent to a CPI unit to remove not emulsified oil and suspended solids; then the raw water is treated by chemicals in order to oxidise and remove the phenols.
  • The water is filtered physically by sand filters and, thanks to the absorbition properties of activated carbon filters the last traces of phenols are removed to meet the design limits.
  • The third step processes the sludge produced in the clariflocculator with the aim to reduce its water content.

Due to the considerable size of the project, the shipment has been divided into different lots to facilitate the customer in the positioning and erection phase.

June 30, 2021

The first batch, including pressure equipment, skids and assembly material was shipped. The goods have been taken in charge by the customer for positioning in the plant.

September 15, 2021

The second major goal was attained: the shipment of the second lot including skid, tank and silo. The supply of pre-assembled and pre-tested skids allows a faster construction of the plant.

October 15, 2021

Engineering of the WWTP project has been completed, while the last shipment of material is approaching for completion of the project scheduled for November.

November 22, 2021

The WWTP project for Nasr Petroleum Company and Petrojet has reached the last step before the commissioning and start-up activities: the shipment of the last batch including skids and interconnections.

Search

News

Recent Posts
  • We are online! New web site and new logo
  • Not only ISO 9001
  • Waste water treatment plant – Petrojet
  • New demi plant, same supplier
  • ISO 9001

New demi plant, same supplier

Previous thumb

Not only ISO 9001

Next thumb
Scroll
idroconsulting

via Aldo Moro 45/47
20060 Gessate MI - Italy

 02 950805.1

Daily: 9:00 am - 6:00pm
Monday-Friday

  idc@idroconsulting.it

Idroconsulting S.p.A. - via Aldo Moro 45/47 - 20060 - Gessate MI - Italy - P.Iva 03940910155 - Univocal Code: KUPCRMI - Idea & Design: Alice Petrella